|
Post by Steve Price on Mar 26, 2006 20:23:19 GMT
We apologise for the problems encountered at the Brum end of operations today. There is a technical fault on the line that connects the hq in London with Birmingham and, despite the best effort of our tech team and BT we have not been able to solve it.
Every effort is being made to get this fixed. In the meantime all programming is being generated in London.
Steve, Paul and Metal Shane
|
|